Solar Park Lelystad

Together with the landowner Gutami has developed a 57 MWp solar park near Lelystad Airport. The solar park is expected to be operational in 2022. It will be constructed in an east-west configuration.

  • location_on
    Municipality of Lelystad
  • Design Phase 1
  • Permits Phase 2
  • Subsidy Phase 3
  • Construction Phase 4
  • Exploitation Phase 5
    aspect_ratio

    30/28 Hectare

    Park Size gross/nett
    solar_power

    138.000

    Solar Panels
    offline_bolt

    58 Mw

    Installed Power
    home

    15.000

    Households
    energy_savings_leaf

    25.000

    Ton Co2 Reduced
arrow_back
arrow_forward
fullscreen
lelystad0010
fullscreen
lelystad0011
fullscreen
lelystad0015
fullscreen
lelystad0019
fullscreen
lelystad0021
fullscreen
lelystad0030
fullscreen
lelystad0031
fullscreen
lelystad0033
fullscreen
3D EastWest and South afbeeldingen3
fullscreen
3D EastWest and South afbeeldingen5
fullscreen
3D EastWest and South afbeeldingen7
fullscreen
3D EastWest and South afbeeldingen9
fullscreen
3D EastWest and South afbeeldingen11
fullscreen
3D EastWest and South afbeeldingen15
fullscreen
Lelystad
close
arrow_back
arrow_forward
lelystad0010
lelystad0011
lelystad0015
lelystad0019
lelystad0021
lelystad0030
lelystad0031
lelystad0033
3D EastWest and South afbeeldingen3
3D EastWest and South afbeeldingen5
3D EastWest and South afbeeldingen7
3D EastWest and South afbeeldingen9
3D EastWest and South afbeeldingen11
3D EastWest and South afbeeldingen15
Lelystad
Banner-v2

Gutami Solar Development Services

Funding, developing, operating and building a Solar Park yourself?

If you encounter obstacles developing a Park, we can help smooth out these obstacles