Solar Park Druten

The municipality of Druten has determined that, in addition to savings, sustainable energy must also be generated in order to be energy-neutral by 2040 at the latest. In order to provide the outlying area with 30 ha of solar fields in a careful manner the municipality has issued a tender with a selection guideline, on the basis of which initiative plans can be assessed. Gutami has developed an initiative within this framework.

  • location_on
    Municipality Druten
  • Design Phase 1
  • Permits Phase 2
  • Subsidy Phase 3
  • Construction Phase 4
  • Exploitation Phase 5
    aspect_ratio

    12/7 Hectare

    Park Size gross/nett
arrow_back
arrow_forward
fullscreen
Druten design0001
fullscreen
Druten design0002
fullscreen
Druten design0003
fullscreen
Druten design0004
fullscreen
Druten design0005
fullscreen
Druten design0006
fullscreen
Druten design0007
fullscreen
Druten design0008
fullscreen
Druten design0009
close
arrow_back
arrow_forward
Druten design0001
Druten design0002
Druten design0003
Druten design0004
Druten design0005
Druten design0006
Druten design0007
Druten design0008
Druten design0009
Banner-v2

Gutami Solar Development Services

Funding, developing, operating and building a Solar Park yourself?

If you encounter obstacles developing a Park, we can help smooth out these obstacles