Solar Park Beuningen

The municipality of Beuningen has issued a tender to carefully provide the Beuningse Kommen area with 40 ha of solar fields. The municipality has developed a selection guideline on the basis of which initiative plans can be assessed. The initiative of Gutami, Zonnepark 't Broek ended first.

  • location_on
    Municipality Beuningen
  • Design Phase 1
  • Permits Phase 2
  • Subsidy Phase 3
  • Construction Phase 4
  • Exploitation Phase 5
    aspect_ratio

    14/10 Hectare

    Park Size gross/nett
    solar_power

    32.000

    Solar Panels
    offline_bolt

    4 Mw

    Installed Power
    home

    3.800

    Households
    energy_savings_leaf

    8.200

    Ton Co2 Reduced
arrow_back
arrow_forward
fullscreen
Beuningen Design 1
fullscreen
Beuningen Design 21
fullscreen
201026_Beuningen_Technisch_Design_1
fullscreen
201026_Beuningen_Technisch_Design_2
fullscreen
201026_Beuningen_Technisch_Design_3
fullscreen
201026_Beuningen_Technisch_Design_4
close
arrow_back
arrow_forward
Beuningen Design 1
Beuningen Design 21
201026_Beuningen_Technisch_Design_1
201026_Beuningen_Technisch_Design_2
201026_Beuningen_Technisch_Design_3
201026_Beuningen_Technisch_Design_4
Banner-v2

Gutami Solar Development Services

Funding, developing, operating and building a Solar Park yourself?

If you encounter obstacles developing a Park, we can help smooth out these obstacles